Work will include removal of a gravel bar, substructure restoration, sidewalk repairs and other related work. Work will be performed during daylight hours. Motorists can expect alternating single lane conditions with flagging.
Wolyniec Construction, Inc., is the primary contractor for the $208,411 bridge rehabilitation project. Work is expected to be completed on October 30, weather permitting.
Motorists should slow down, watch for lane changes, slow moving vehicles and drive with caution through the work zone.
Work on this project will be in accordance with Centers for Disease Control and state Department of Health guidance as well as a project-specific COVID-19 safety plan, which will include protocols for social distancing, use of face coverings, personal and job-site cleaning protocols, management of entries to the jobsite, and relevant training.
Subscribe to PennDOT news in Bradford, Columbia, Lycoming, Montour, Northumberland, Snyder, Sullivan, Tioga and Union counties at www.penndot.gov/District3.
Motorists can check conditions on more than 40,000 roadway miles by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,000 traffic cameras.
511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional Twitter alerts accessible on the 511PA website.
Follow PennDOT on Twitter at www.twitter.com/511PAStateColl and like the department on Facebook at www.facebook.com/PennsylvaniaDepartmentofTransportation and Instagram at www.instagram.com/pennsylvaniadot.